Free ADU Calculator

What Your ADU Costs, What It Rents For, And When It Pays Off

Enter your property address, choose a new backyard ADU or a garage conversion, and pick a size and finish level. You'll see the full cost from plans and permits to finish materials, then the average rent for that unit in your area and how many years the rent takes to cover the build.

1. Property Address

2. What Are You Building?

3. Size

4. Finish Level

Estimated Total Cost

$226,500 – $281,500

New Detached ADU · 1 Bed / 1 Bath · 600 sq ft · Standard finishes · priced for Elsewhere in LA County

Planning

Architectural design & plans$12,000
Structural engineering & Title 24 energy report$6,000
Permits, plan check & city/school fees$11,000

Construction

Site prep, trenching, utilities & sewer connection$26,500
Foundation, framing, roof, plumbing, electrical & HVAC$144,000

Finishes

Finish materials & install: flooring, cabinets, counters, tile, fixtures$46,000
Appliances$6,000
Midpoint total$251,500

Planning ranges, not a quote. Hillside lots, long sewer runs, a required panel upgrade or soils issues can move the number. Hold 10 to 15 percent as contingency.

Last Step

Check Rental Income

We'll check current rental listings on Zillow, Redfin and Realtor.com near your property for this unit type, then show your average rent and how long the ADU takes to pay for itself.

We use session recording and analytics to understand how visitors use this site and improve your experience. By continuing to browse, you consent to this. Read our privacy policy