Malibu wildfire rebuild
Fire Rebuild Contractor Malibu
Licensed design-build reconstruction for Malibu homeowners rebuilding after the January 2025 fires. Permits are handled through City of Malibu Planning and Building Safety, with LA County Fire and LA County Waterworks as partner agencies.
Talk To A Rebuild ManagerShort Answer
1 Smart Build is a licensed design-build general contractor (CSLB #1076428) rebuilding homes lost in the January 2025 Palisades Fire and the December 2024 Franklin Fire in Malibu. Permits run through the City of Malibu when the parcel is inside city limits, and through LA County when it is not, so confirming jurisdiction is the first step. We document the loss for your carrier, take the plans through City planning and plan check, and engineer the rebuild for Malibu's coastal and hillside conditions. Planning range is $350 to $650 per square foot, and 18 to 30 months from claim to certificate of occupancy.
- Planning cost range
- $350 to $650 per square foot, set by finish level, slope and site work
- Typical timeline
- 18 to 30 months from claim to certificate of occupancy
- Permit authority
- City of Malibu Planning and Building Safety, with LA County Fire and LA County Waterworks as partner agencies
- Credentials
- 1 Smart Build Inc. Licensed and insured. CSLB #1076428, Class B. Owner-operated.
Confirm Your Malibu Parcel's Jurisdiction First
A Malibu mailing address does not always mean the parcel is inside the City of Malibu. The City issues permits and works with partner agencies, including LA County Fire and LA County Waterworks, but parcels outside city limits are handled by Los Angeles County. The City publishes a rebuild guide and a Rebuild Navigator tool at maliburebuilds.org to help owners find their path. Those resources are informational, and the City's formal plan review is what decides your project.
- Verify the parcel is inside City of Malibu limits and pull property records
- Planning review first, to determine where and what can be rebuilt
- Building plan review second, for code and safety compliance
- City inspections during construction, then a certificate of occupancy
Rebuild Rules And Deadlines For Malibu Owners
For Palisades Fire rebuilds, Executive Order N-20-25 suspended CEQA and Coastal Act requirements and set a rebuild plus 10 percent allowance. Under the City's code (Malibu Municipal Code 17.60.020(C)), rebuild applicants have six years from the date of the fire to submit a planning application, and eight years to obtain a building permit, to replace pre-existing nonconforming aspects such as setbacks, height and square footage. Rebuilding after those periods may still be allowed, but the replacement home may not be able to return to its original form. The City Council has also adopted rebuild fee waivers for eligible like-for-like projects.
- Six years to submit a planning application for nonconforming rebuilds
- Eight years to obtain a building permit under the same provision
- Rebuild fee waivers for eligible like-for-like projects
- Septic (OWTS) operating permit required within 60 days after the certificate of occupancy
Coastal And Hillside Engineering
Malibu rebuilds combine fire, slope and coast. Many lots need updated soils and geology reports, retaining walls or caissons, and drainage designed for burn-scar runoff, in addition to California's wildfire construction requirements (Building Code Chapter 7A). We specify those assemblies in the drawings before pricing, so the estimate reflects what will actually pass inspection.
- Soils and geology review before foundation design
- Caissons, grade beams and retaining walls where the slope requires them
- Ignition-resistant or noncombustible siding, eaves and soffits
- Ember-resistant vents, tempered glazing and Class A roof assemblies
- Septic and drainage planned with the site work
Insurance Scope And Underinsurance
Many Malibu owners are rebuilding on older policies with replacement limits that no longer match construction costs. We give you a line-item construction scope early enough to see the gap, and we can phase the rebuild or right-size the plan instead of discovering a shortfall halfway through framing.
- Line-item scope written for adjuster review
- Code upgrade coverage identified separately
- Phasing options when the claim falls short of the rebuild cost
- Draw schedule matched to insurer payment stages
FREQUENTLY ASKED QUESTIONS
Who issues building permits for a Malibu fire rebuild?
The City of Malibu issues permits for parcels inside city limits, working with partner agencies including LA County Fire and LA County Waterworks. Parcels with a Malibu mailing address that sit outside city limits are handled by Los Angeles County. We confirm your parcel's jurisdiction before design starts.
How long do I have to rebuild in Malibu?
Under Malibu Municipal Code 17.60.020(C), owners have six years from the date of the fire to submit a planning application, and eight years to obtain a building permit, to replace pre-existing nonconforming aspects such as setbacks, height and square footage. After those periods a rebuild may still be allowed, but the replacement may not be able to return to its original form.
Does Malibu have rebuild fee waivers?
Yes. The City Council has adopted rebuild fee waivers for eligible like-for-like projects. Eligibility depends on your project, so confirm it with the City and we will build it into your budget.
Are Malibu homes being rebuilt yet?
Yes. As of September 14, 2026, the City of Malibu reported 370 planning approvals, 66 projects in plan check, its 100th rebuild permit, and its first certificate of occupancy for a completed rebuilt home, issued about 11 months after that owner's permit.
How much does a Malibu fire rebuild cost?
Planning range is $350 to $650 per square foot. Coastal and hillside foundations, wildfire-rated exterior assemblies, septic work and the finish level chosen are what move a specific project inside that range.
What are my cancellation rights after a disaster?
For repair or restoration of a home damaged by a declared disaster, California law gives you until midnight of the seventh business day after signing to cancel without penalty (Civil Code 1689.6). In addition, a home solicitation contract signed within 7 business days after the disaster is void unless you, your agent or your insurer initiated the contact at our place of business (Civil Code 1689.14). Every contract we sign includes a Notice of Cancellation form. We price disaster rebuilds at our standard pricing, with no emergency premium.
Also see our fire rebuild service overview, project case studies and verified license and insurance details. Permit requirements change, so confirm current rules with City of Malibu Planning and Building Safety, with LA County Fire and LA County Waterworks as partner agencies before you rely on any timeline here. The rules summarized on this page were last reviewed in October 2026.