800 sq ft Detached ADU in Encino
Encino · $268,000 · 11 months, design to final inspection
A rear-yard detached ADU built for the owners' parents, with its own address, separate electrical sub-panel and a private entry off the side yard.
View Project
Kitchen Remodel with Load-Bearing Wall Removal, Sherman Oaks
Sherman Oaks · $94,000 · 9 weeks of construction
A closed-off 1954 kitchen opened into the dining and living rooms with an engineered beam, a 10 ft island and relocated plumbing and gas.
View Project
Primary Bath Suite in a 1912 Pasadena Craftsman
Pasadena · $52,000 · 5 weeks of construction
A gut renovation of an original bathroom in a historic Craftsman, with a curbless shower, heated floors and period-appropriate fixtures.
View Project
Second-Story Addition in Burbank
Burbank · $412,000 · 10 months including permitting
A 1,050 sq ft second story added over an existing 1940s single-story home, with foundation and framing reinforcement to carry the new load.
View Project
Hillside Foundation Repair and Seismic Retrofit, Silver Lake
Silver Lake · $178,000 · 4 months
A 1926 hillside home that had settled several inches was underpinned with new caissons and grade beams, then bolted and braced to current standards.
View Project
Garage Conversion to Permitted ADU, Woodland Hills
Woodland Hills · $118,000 · 7 months including permitting
A detached two-car garage converted into a permitted one-bedroom ADU, now rented long-term.
View Project
Whole-Home Remodel of a 1920s Santa Monica Bungalow
Santa Monica · $585,000 · 13 months including design and permitting
A full gut renovation of a 1924 bungalow: new mechanical, electrical and plumbing throughout, structural corrections, and a rebuilt kitchen and three baths.
View Project
New 4,800 sq ft Custom Home on a Calabasas Hillside
Calabasas · $3.1 million · 26 months including entitlement
Ground-up construction of a 4,800 sq ft home on a graded hillside pad, including caisson foundations, retaining walls and a full site build-out.
View Project
Whole-Home Remodel on a Manhattan Beach Walk Street
Manhattan Beach · $640,000 · 12 months including permitting
A dated 1950s beach house rebuilt inside and out on a narrow walk-street lot, with corrosion-resistant materials chosen for the salt air.
View Project
Family Room and Bath Addition in Glendale
Glendale · $186,000 · 6 months including permitting
A vaulted family room and full bathroom added off the rear of a 1958 Glendale home, opening to the backyard with a wide sliding door.
View Project
Soft-Story Seismic Retrofit of a Long Beach Fourplex
Long Beach · $142,000 · 3 months
A 1962 fourplex with tuck-under parking brought into compliance with a steel moment frame system, with all four units occupied throughout.
View Project
Mid-Century Kitchen Remodel in Studio City
Studio City · $108,000 · 10 weeks of construction
A 1961 post-and-beam kitchen rebuilt with walnut cabinetry and terrazzo counters, keeping the original exposed beam ceiling fully intact.
View Project
1,000 sq ft Detached ADU in Northridge
Northridge · $295,000 · 10 months, design to final inspection
A two-bedroom detached ADU built at the back of a deep Northridge lot, designed to match the main house so it reads as original.
View Project
SB9 Lot Split with Two New Homes, Highland Park
Highland Park · $1.24 million · 22 months including the split and both builds
A single 6,800 sq ft Highland Park lot split under SB9 into two parcels, each with a new two-story detached home.
View Project
Attached Garage Converted to a Studio ADU, Torrance
Torrance · $96,000 · 6 months including permitting
An attached two-car garage turned into a permitted studio ADU with its own entry, now housing an adult child rent-free.
View Project
Cantilevered Addition on Caissons, Hollywood Hills
Hollywood Hills · $720,000 · 18 months including hillside review
A cantilevered primary suite and view deck added to a Hollywood Hills home, carried on drilled caissons and steel moment frames.
View Project
Two Guest Bath Remodels in a Culver City Traditional
Culver City · $61,000 · 6 weeks of construction
Both original 1946 bathrooms in a Culver City traditional gutted and rebuilt at the same time, with new supply and drain lines.
View Project
New Custom Coastal Home in Pacific Palisades
Pacific Palisades · $4.2 million · 28 months including entitlement
Ground-up construction of a 5,200 sq ft coastal modern home on a canyon-edge lot, including a courtyard, pool and full site build-out.
View Project
Fire Rebuild on Wheeler Ave, Sylmar
Sylmar · $486,000 · 14 months including insurance scope and permitting
On Wheeler Ave in Sylmar, a fire-damaged single-story ranch home was taken down to its foundation and rebuilt to current code, with the insurance scope aligned before construction started.
View Project
Foundation Replacement Under a 1920s Duplex, Beverly Grove
Los Angeles (Beverly Grove) · $132,000 · 3.5 months
On N Vista St near Fairfax, the crumbling unreinforced perimeter foundation under a 1920s Spanish duplex was replaced in sections while both units stayed occupied.
View Project
Garage Conversion ADU on Forbes Ave, North Hills
North Hills · $112,000 · 6 months including permitting
On Forbes Ave in North Hills, a detached two-car garage became a permitted one-bedroom ADU with its own entry, kitchen and laundry hookup.
View Project
Kitchen Remodel on Florentina Ave, Alhambra
Alhambra · $72,000 · 8 weeks of construction
On Florentina Ave in Alhambra, a closed-off 1940s kitchen was rebuilt with new cabinetry, quartz counters and a widened opening to the dining room.
View Project
Primary Bathroom Remodel on Cass Ave, Woodland Hills
Woodland Hills · $48,000 · 5 weeks of construction
On Cass Ave in Woodland Hills, a cramped 1960s primary bathroom was gutted and rebuilt with a large walk-in shower, double vanity and new plumbing.
View Project
Room Addition on El Rodeo Rd, Rancho Palos Verdes
Rancho Palos Verdes · $224,000 · 8 months including permitting
On El Rodeo Rd in Rancho Palos Verdes, a rear addition added a family room and fourth bedroom to a single-story peninsula home, matched to the existing roofline.
View Project
Garage Conversion on S Dalton Ave, Gardena
Gardena · $89,000 · 5 months including permitting
On S Dalton Ave in Gardena, an attached two-car garage was converted into a permitted studio ADU with its own entrance and kitchenette.
View Project
Kitchen Remodel on Flint Ave, Long Beach
Long Beach · $66,000 · 7 weeks of construction
On Flint Ave in Long Beach, the original kitchen in a 1920s Spanish bungalow was rebuilt with period-appropriate finishes and all-new plumbing and electrical behind the walls.
View Project
Complete Home Remodel on Ferrara Ln, Porter Ranch
Porter Ranch · $395,000 · 10 months including permitting
On Ferrara Ln in Porter Ranch, a dated 1990s two-story tract home was renovated top to bottom: new kitchen, all bathrooms, flooring, HVAC and a reworked main floor layout.
View Project
Family Room Addition on Firebird Ave, Whittier
Whittier · $158,000 · 6 months including permitting
On Firebird Ave in Whittier, a rear family room addition opened a 1950s ranch home to its backyard with a wide sliding glass door.
View Project
Detached ADU on Louvre St, Pacoima
Pacoima · $205,000 · 9 months, design to final inspection
On Louvre St in Pacoima, a new 600 sq ft detached ADU was built in the backyard as a long-term rental, with its own utilities and address.
View Project
Hall Bathroom Remodel on W 118th St, Hawthorne
Hawthorne · $34,000 · 4 weeks of construction
On W 118th St in Hawthorne, the only full bathroom in a 1950s home was gutted and rebuilt in four weeks with a new tub, tile surround and all-new plumbing.
View Project
750 sq ft Detached ADU in Dana Point
Dana Point · $262,000 · 10 months, design to final inspection
A rear-yard ADU on a coastal lot, built with corrosion-resistant fasteners and openings rated for salt air, now rented long-term.
View Project
Garage Conversion to Studio ADU, Laguna Niguel
Laguna Niguel · $104,000 · 6 months including permitting
A two-car garage in a planned community converted into a studio ADU, with the exterior kept to HOA standards.
View Project
Complete Remodel of a 1980s Two-Story, Mission Viejo
Mission Viejo · $368,000 · 9 months including permitting
A dated 1984 two-story opened up on the main floor, with a new kitchen, four bathrooms, flooring, HVAC and a repositioned staircase.
View Project
New 3,600 sq ft Custom Home in Irvine
Irvine · $2.05 million · 20 months including plan check
Tear-down and ground-up rebuild of a 1970s tract home into a two-story contemporary with a courtyard and detached garage.
View Project
New Coastal Home on a Narrow Lot, Newport Beach
Newport Beach · $3.4 million · 24 months including coastal review
A three-story home with roof deck built on a 30 ft wide lot, with a shallow foundation system designed for high groundwater.
View Project
Detached Backyard ADU in Huntington Beach
Huntington Beach · $241,000 · 9 months, design to final inspection
A board-and-batten ADU built behind a 1960s single-story, with a covered porch and its own side-yard entry.
View Project
Whole-Home Remodel of a 1960s Ranch, Costa Mesa
Costa Mesa · $312,000 · 8 months including permitting
A closed-plan 1962 ranch gutted to the studs and rebuilt with an open kitchen, three new baths and a wall of sliding doors to the yard.
View Project
Attached Garage Converted to a One-Bedroom ADU, Anaheim
Anaheim · $98,000 · 5 months including permitting
An attached two-car garage on a 1960s tract home became a permitted one-bedroom ADU with its own street-facing entry.
View Project
SB9 Lot Split with Two New Homes, Fullerton
Fullerton · $1.38 million · 21 months including the split and both builds
A 9,000 sq ft Fullerton lot split under SB9 into two parcels, each with a new two-story modern farmhouse.
View Project
900 sq ft Detached ADU Behind a Craftsman, Orange
Orange · $284,000 · 11 months, design to final inspection
A two-bedroom ADU designed to match a 1915 Craftsman inside the Old Towne historic district, with wood siding and a gabled porch.
View Project
New Single-Story Custom Home in Palmdale
Palmdale · $915,000 · 16 months including plan check
Ground-up construction of a single-story home on a flat acre lot, with a stone-and-stucco exterior and a three-car garage.
View Project
1,000 sq ft Detached ADU in Lancaster
Lancaster · $228,000 · 9 months, design to final inspection
A full-size two-bedroom ADU built on a wide Lancaster lot for the owners' adult children, with its own driveway and parking.
View Project
Complete Remodel of a Two-Story Tract Home, Santa Clarita
Santa Clarita · $342,000 · 9 months including permitting
A 1990s two-story renovated top to bottom, with an opened main floor, new kitchen, all bathrooms, flooring and HVAC.
View Project
Partial Garage Conversion to ADU, Valencia
Valencia · $92,000 · 5 months including permitting
Two bays of a three-car garage converted into a studio ADU while the third bay stayed as a garage.
View Project
New Custom Hillside Home in Stevenson Ranch
Stevenson Ranch · $1.62 million · 19 months including grading
Ground-up construction of a Spanish contemporary home on a graded hillside pad, with retaining walls and a full site build-out.
View Project
Detached Backyard ADU in Simi Valley
Simi Valley · $236,000 · 9 months, design to final inspection
A one-bedroom ADU with a pergola-covered patio built behind a 1970s single-story, now housing the owners' parents.
View Project
New Farmhouse-Style Custom Home in Moorpark
Moorpark · $1.48 million · 18 months including plan check
Ground-up construction of a board-and-batten farmhouse on a half-acre lot with mature oaks, a metal roof and a detached workshop.
View Project
Whole-Home Remodel of a 1970s Home, Thousand Oaks
Thousand Oaks · $398,000 · 10 months including permitting
A 1974 single-story gutted and rebuilt with exposed vaulted beams, an open kitchen, three new bathrooms and all-new systems.
View Project
Detached Garage Converted to a One-Bedroom ADU, Camarillo
Camarillo · $108,000 · 6 months including permitting
A detached two-car garage became a permitted one-bedroom ADU with French doors opening to a citrus grove.
View Project
800 sq ft Detached ADU in Oxnard
Oxnard · $232,000 · 9 months, design to final inspection
A two-bedroom ADU built on a deep Oxnard lot for multigenerational living, with its own patio and entry.
View Project
New Ocean-View Custom Home on a Ventura Hillside
Ventura · $2.3 million · 22 months including hillside review
A two-story modern home built on a steep Ventura lot, with caisson foundations, a view deck and fire-hardened exterior assemblies.
View Project
SB9 Lot Split with Two New Homes, Newbury Park
Newbury Park · $1.29 million · 20 months including the split and both builds
A 10,000 sq ft suburban lot split under SB9 into two parcels, each with a new single-story contemporary ranch.