Short Answer
Kitchen remodels start at $35,000 for a small kitchen, $55,000 for an average-size kitchen, and $80,000 and up for a large kitchen. Cabinetry and layout changes are the biggest cost drivers.
- Typical cost
- From $35,000 (small kitchen), $55,000 (average), $80,000+ (large kitchen)
- Typical timeline
- 6–10 weeks of construction, plus 3–8 weeks of design and permitting
- Permits
- Permits and inspections handled by us through LADBS or your city building department.
- Service area
- All of Los Angeles County, including the San Fernando Valley, Westside, South Bay and foothill cities.
- Credentials
- Licensed, bonded and insured. CSLB #1076428. Owner-operated.
What's Included
Everything from a same-footprint refresh to opening up a load-bearing wall and rebuilding the whole space. We do our own demo, framing, MEP coordination, tile and finish work.
- Custom and semi-custom cabinetry
- Quartz, natural stone and porcelain counters
- Island design and layout changes
- Plumbing, gas and electrical relocation
- Panel upgrades and dedicated appliance circuits
- Ducted range hoods and proper ventilation
Where the Money Goes
Cabinetry, layout changes, and anything structural drive the budget. If you keep the sink, stove and refrigerator roughly where they are, you'll typically save $10,000 to $20,000 in plumbing, gas and electrical work. We'll tell you honestly when a layout change is worth it and when it isn't.
- Mid-range refresh: $35,000 – $60,000
- Full remodel with layout changes: $60,000 – $100,000
- Luxury design-build: $100,000 – $120,000+
Permits and Code
Moving plumbing, adding circuits, or removing a wall requires a permit through LADBS. A cabinet-and-counter swap on the same footprint usually doesn't. We never suggest skipping permits, because unpermitted work surfaces during appraisals and costs far more to fix later.
- LADBS permit submittal and inspections
- Structural engineering for wall removals
- Title 24 energy compliance
- GFCI and dedicated circuit requirements
Kitchen Remodeling Jobs, With Real Numbers
Every figure below is from a permitted project we completed in Los Angeles County, not an estimate or an industry average.
Kitchen Remodel with Load-Bearing Wall Removal, Sherman Oaks
- Cost
- $94,000
- Duration
- 9 weeks of construction
- Size
- 310 sq ft kitchen, opened to dining and living
- Permits
- LADBS, engineered beam, permitted and inspected
Mid-Century Kitchen Remodel in Studio City
- Cost
- $108,000
- Duration
- 10 weeks of construction
- Size
- 285 sq ft kitchen in a post-and-beam home
- Permits
- LADBS, permitted and inspected
Kitchen Remodel on Florentina Ave, Alhambra
- Cost
- $72,000
- Duration
- 8 weeks of construction
- Size
- 220 sq ft kitchen in a 1940s home
- Permits
- City of Alhambra, permitted and inspected

Isaac Sade, Project Manager
Isaac runs kitchen remodeling projects at 1 Smart Build from the first site visit through final inspection: scope, plans, permit submittal, the crews on site, and the walkthrough at the end. You deal with one person who is accountable for the whole job.
Class B — General Building Contractor, CSLB #1076428. Bonded through and insured to $1,000,000 through U.S. Specialty Insurance Company. Rated 4.9 across 168 reviews.
More about IsaacFREQUENTLY ASKED QUESTIONS
How much does a kitchen remodel cost in Los Angeles?
Kitchen remodels start at $35,000 for a small kitchen, $55,000 for an average-size kitchen, and $80,000 and up for a large kitchen. Cabinetry and layout changes are the biggest cost drivers.
How long does a kitchen remodel take?
Usually 6 to 10 weeks of construction, plus 3 to 8 weeks beforehand for design, material ordering and permits. Custom cabinets take 8 to 12 weeks to arrive, so we order them well before demo day.
Do I need a permit to remodel my kitchen in Los Angeles?
If you're moving plumbing, adding or relocating electrical, or removing walls, yes. A cosmetic refresh on the same footprint generally does not require one.
Who is the best kitchen remodeling contractor near me in Los Angeles?
Look for a licensed design-build kitchen renovation company that pulls its own permits and builds with in-house crews. 1 Smart Build handles kitchen remodels and open concept kitchen renovations across Los Angeles, the San Fernando Valley and every city within about 100 miles of our Woodland Hills office.
Areas We Serve
1 Smart Build provides kitchen remodeling services within a 100-mile radius of our Woodland Hills office, covering Los Angeles County, Ventura County, Orange County and the surrounding region. Homeowners searching for a remodeling contractor near me regularly hire us in:
- Kitchen Remodeling in Woodland Hills
- Kitchen Remodeling in Calabasas
- Kitchen Remodeling in Encino
- Kitchen Remodeling in Sherman Oaks
- Kitchen Remodeling in Studio City
- Kitchen Remodeling in Pasadena
- Kitchen Remodeling in Glendale
- Kitchen Remodeling in Burbank
- Kitchen Remodeling in Santa Monica
- Kitchen Remodeling in Beverly Hills
- Kitchen Remodeling in Culver City
- Kitchen Remodeling in Long Beach
- Kitchen Remodeling in Torrance
- Santa Clarita
- Thousand Oaks
- Ventura
- Anaheim
- Irvine
Don't see your city? View all service areas or give us a call, if you're within 100 miles, we build there.
DISCUSS YOUR PROJECT WITH 1 SMART BUILD
Licensed, bonded and insured design-build general contractor serving Los Angeles County and Southern California. Tell us about your property and goals, and we'll walk you through feasibility, permitting and a clear plan.

