Fire Rebuild on Wheeler Ave, Sylmar
On Wheeler Ave in Sylmar, a fire-damaged single-story ranch home was taken down to its foundation and rebuilt to current code, with the insurance scope aligned before construction started.

- Final cost
- $486,000
- Duration
- 14 months including insurance scope and permitting
- Size
- 1,650 sq ft, 3 bed / 2 bath rebuilt
- Permits
- LADBS, permitted and inspected
SCOPE OF WORK
- Debris removal and hazardous material clearance
- Foundation evaluation and partial replacement
- Full reframe, roof and fire-hardened exterior assemblies
- Complete new electrical, plumbing and HVAC
- Ember-resistant vents and Class A roofing for the fire zone
WHAT WE RAN INTO
The insurance carrier's initial scope missed code-upgrade items the rebuild legally required, including fire-hardening in a Very High Fire Hazard Severity Zone. We documented every required upgrade line by line and got the scope supplemented before demolition, so the owners weren't paying for code items out of pocket.
THE RESULT
The family moved back into a home rebuilt to current fire-zone standards, with the full code-upgrade cost carried by the claim.
DISCUSS YOUR PROJECT WITH 1 SMART BUILD
Licensed, bonded and insured design-build general contractor serving Los Angeles County and Southern California. Tell us about your property and goals, and we'll walk you through feasibility, permitting and a clear plan.
More Projects

800 sq ft Detached ADU in Encino
A rear-yard detached ADU built for the owners' parents, with its own address, separate electrical sub-panel and a private entry off the side yard.

Kitchen Remodel with Load-Bearing Wall Removal, Sherman Oaks
A closed-off 1954 kitchen opened into the dining and living rooms with an engineered beam, a 10 ft island and relocated plumbing and gas.

Primary Bath Suite in a 1912 Pasadena Craftsman
A gut renovation of an original bathroom in a historic Craftsman, with a curbless shower, heated floors and period-appropriate fixtures.