Seismic Retrofit

Soft-Story Seismic Retrofit of a Long Beach Fourplex

A 1962 fourplex with tuck-under parking brought into compliance with a steel moment frame system, with all four units occupied throughout.

Seismic Retrofit in Long Beach
Final cost
$142,000
Duration
3 months
Size
4 units over tuck-under parking
Permits
Long Beach Development Services, engineered plans, permitted and inspected

SCOPE OF WORK

  • Structural engineering and city plan check
  • Steel moment frames at the open parking line
  • New concrete footings with epoxy-set anchor bolts
  • Shear transfer connections into the floor above
  • Patch, prime and paint of all disturbed finishes

WHAT WE RAN INTO

Tenants could not lose parking for three months. We built the frames one bay at a time, so only two stalls were out of service on any given day.

THE RESULT

The building cleared its retrofit compliance deadline with no vacancies and no rent credits.

Free Consultation

DISCUSS YOUR PROJECT WITH 1 SMART BUILD

Licensed, bonded and insured design-build general contractor serving Los Angeles County and Southern California. Tell us about your property and goals, and we'll walk you through feasibility, permitting and a clear plan.

1 (866) 419-8840
Want to price your Los Angeles remodel or addition first?Get an Instant Estimate →

More Projects

We use session recording and analytics to understand how visitors use this site and improve your experience. By continuing to browse, you consent to this. Read our privacy policy