- Typical cost
- From $18,000 (guest bath), $28,000 (mid-range), $58,000+ (master suite)
- Typical timeline
- 3–5 weeks of construction
- Permits through
- Beverly Hills Community Development
- Service area
- Beverly Hills, Westside
What We Do
Full gut renovations, primary bath suites, guest baths and powder rooms. We do the waterproofing ourselves and don't hide it behind someone else's schedule.
- Curbless and custom tile showers
- Freestanding and drop-in tubs
- Custom vanities and storage
- Heated floors and niche lighting
- Full waterproofing assemblies
- Exhaust ventilation sized to the room
Bathroom Remodeling Conditions in Beverly Hills
The housing stock spans 1920s Spanish and traditional homes to 1960s moderns, and the older ones need the usual invisible work: rewiring, replumbing, foundation bolting and insulation. Design review applies to exterior changes in parts of the city, and street trees, setbacks and hedge rules can affect a plan. Flats build easily; the hillside north of Sunset needs grading and geotechnical work.
- City of Beverly Hills plan check with its own local amendments
- Enforced construction hours and neighbor notification requirements
- 1920s Spanish and traditional homes needing rewire, replumb and bolting
- Exterior design review in parts of the city
- Hillside grading and geotechnical scope north of Sunset
The Part Nobody Sees
Waterproofing is the single most important part of a bathroom, and it's the first thing a cheap bid cuts. We install a complete waterproofing assembly behind the tile, slope the pan correctly, and pressure-test before anything gets covered up.
- Sheet or liquid membrane behind all wet walls
- Properly sloped, tested shower pans
- Backer board instead of drywall in wet areas
- Sealed penetrations at valves and drains
Permits and Timeline
Relocating fixtures or adding circuits needs a permit. Most bathrooms run 3 to 5 weeks of construction once materials are on site. The schedule slips when tile and fixtures are ordered late, so we lock selections before demo.
- Plumbing and electrical permits through LADBS
- Selections finalized before demolition
- Daily photo updates in your client portal
FREQUENTLY ASKED QUESTIONS
Do you do bathroom remodeling in Beverly Hills?
Yes. Beverly Hills is part of our regular service area. We'll come out for a free on-site consultation, walk the property, and tell you what's realistic before you spend anything on design.
What does bathroom remodeling cost in Beverly Hills?
From $18,000 (guest bath), $28,000 (mid-range), $58,000+ (master suite). Site conditions in Beverly Hills and your material selections move the number, which is why we price after walking the property rather than over the phone.
Who issues the permit in Beverly Hills?
Permits for this work go through Beverly Hills Community Development. We handle the submittal, plan check corrections and inspections as part of the project.
How much does a bathroom remodel cost in Los Angeles?
Bathroom remodels in LA start at $18,000 for a guest bath, $28,000 for a mid-range full remodel, and $58,000 and up for a master suite, depending on size, whether fixtures move, and the tile and fixture selections.
How long does a bathroom remodel take?
Typically 3 to 5 weeks of construction once materials are on site, assuming no surprises behind the walls in an older LA home.
Do you handle waterproofing yourselves?
Yes. Our own crews install the waterproofing assembly and we test the shower pan before tile goes on. It's the most common failure point in a bathroom and we don't subcontract it out.
Do you handle walk-in shower conversions and small bathroom remodels near me?
Yes. Curbless and walk-in shower conversions, powder room updates and small bathroom renovations are some of our most common projects. Homeowners searching for bathroom renovation contractors near me hire us across LA County and neighboring cities within about 100 miles of Woodland Hills.
Similar Projects We've Built

Primary Bath Suite in a 1912 Pasadena Craftsman
A gut renovation of an original bathroom in a historic Craftsman, with a curbless shower, heated floors and period-appropriate fixtures.

Two Guest Bath Remodels in a Culver City Traditional
Both original 1946 bathrooms in a Culver City traditional gutted and rebuilt at the same time, with new supply and drain lines.

Primary Bathroom Remodel on Cass Ave, Woodland Hills
On Cass Ave in Woodland Hills, a cramped 1960s primary bathroom was gutted and rebuilt with a large walk-in shower, double vanity and new plumbing.
DISCUSS YOUR PROJECT WITH 1 SMART BUILD
Licensed, bonded and insured design-build general contractor serving Los Angeles County and Southern California. Tell us about your property and goals, and we'll walk you through feasibility, permitting and a clear plan.
