SB9 Lot Splits & Two-Unit Development in Beverly Hills, CA
SB9 · Beverly Hills

SB9 LOT SPLITS & TWO-UNIT DEVELOPMENT IN BEVERLY HILLS

We handle sb9 lot splits & two-unit development throughout Beverly Hills and the surrounding Westside. Beverly Hills is mostly period revival homes with strict design review, which changes how this work gets scoped and what Beverly Hills Community Development will approve. You get design, permits and construction from one licensed team, with a fixed-price proposal before anything starts.

Typical cost
Varies by parcel, unit count and site work
Typical timeline
12–24 months including entitlement and permitting
Permits through
Beverly Hills Community Development
Service area
Beverly Hills, Westside

What SB9 Allows

Two paths, sometimes combined: splitting one parcel into two, or building a second unit on the existing parcel. Both are ministerial approvals when the criteria are met.

  • Urban lot splits into two parcels
  • Two-unit developments on a single parcel
  • New duplexes and detached second homes
  • Combining SB9 with an ADU where allowed
  • Tear-down and rebuild scenarios

SB9 Lot Splits & Two-Unit Development Conditions in Beverly Hills

The housing stock spans 1920s Spanish and traditional homes to 1960s moderns, and the older ones need the usual invisible work: rewiring, replumbing, foundation bolting and insulation. Design review applies to exterior changes in parts of the city, and street trees, setbacks and hedge rules can affect a plan. Flats build easily; the hillside north of Sunset needs grading and geotechnical work.

  • City of Beverly Hills plan check with its own local amendments
  • Enforced construction hours and neighbor notification requirements
  • 1920s Spanish and traditional homes needing rewire, replumb and bolting
  • Exterior design review in parts of the city
  • Hillside grading and geotechnical scope north of Sunset

Eligibility Comes First

A lot has to be in a single-family zone, meet minimum size after the split, and sit outside certain hazard and historic categories. Recent rental or eviction history can also disqualify a property. We check all of it before you spend money on design.

  • Zoning and parcel size verification
  • Fire-severity, flood and hazard zone screening
  • Historic district and HPOZ constraints
  • Rental and eviction history review
  • Owner-occupancy and deed restriction requirements

From Parcel Map to Keys

SB9 projects involve a survey, a parcel map, utility separation, and then a full building permit for each unit. Because we design and build, one team carries it from the eligibility letter through the final inspection.

  • Survey and tentative parcel map
  • Separate utility services and meters
  • Architectural plans and structural engineering
  • Plan check corrections handled by us
  • Construction with our own crews

FREQUENTLY ASKED QUESTIONS

Do you do sb9 lot splits & two-unit development in Beverly Hills?

Yes. Beverly Hills is part of our regular service area. We'll come out for a free on-site consultation, walk the property, and tell you what's realistic before you spend anything on design.

What does sb9 lot splits cost in Beverly Hills?

Varies by parcel, unit count and site work. Site conditions in Beverly Hills and your material selections move the number, which is why we price after walking the property rather than over the phone.

Who issues the permit in Beverly Hills?

Permits for this work go through Beverly Hills Community Development. We handle the submittal, plan check corrections and inspections as part of the project.

Does my lot qualify for an SB9 split?

It has to be in a single-family zone, be large enough that both resulting parcels meet the minimum, and avoid certain hazard, historic and rental-history disqualifiers. We run the eligibility review before any design work.

How long does an SB9 project take?

Plan on 12 to 24 months from eligibility review to finished units, with the parcel map and plan check often taking as long as construction.

Can I build an ADU on an SB9 lot?

Sometimes, depending on the path you take and your city's implementation. We map out the maximum unit count for your parcel up front so you can compare options.

Do you handle SB9 projects near me outside the City of Los Angeles?

Yes. SB9 is state law, so it applies across California, but every city implements it differently. We handle SB9 lot splits and two-unit developments throughout the greater LA area within about 100 miles of our Woodland Hills office.

Similar Projects We've Built

Free Consultation

DISCUSS YOUR PROJECT WITH 1 SMART BUILD

Licensed, bonded and insured design-build general contractor serving Los Angeles County and Southern California. Tell us about your property and goals, and we'll walk you through feasibility, permitting and a clear plan.

1 (866) 419-8840
Want to price your Los Angeles remodel or addition first?Get an Instant Estimate →

We use session recording and analytics to understand how visitors use this site and improve your experience. By continuing to browse, you consent to this. Read our privacy policy