SB9 Lot Splits & Two-Unit Development in Reseda, CA
SB9 · Reseda

SB9 LOT SPLITS & TWO-UNIT DEVELOPMENT IN RESEDA

We handle sb9 lot splits & two-unit development throughout Reseda and the surrounding San Fernando Valley. Reseda is mostly 1950s tract homes with detached garages, which changes how this work gets scoped and what LADBS will approve. You get design, permits and construction from one licensed team, with a fixed-price proposal before anything starts.

Typical cost
Varies by parcel, unit count and site work
Typical timeline
12–24 months including entitlement and permitting
Permits through
LADBS
Service area
Reseda, San Fernando Valley

What SB9 Allows

Two paths, sometimes combined: splitting one parcel into two, or building a second unit on the existing parcel. Both are ministerial approvals when the criteria are met.

  • Urban lot splits into two parcels
  • Two-unit developments on a single parcel
  • New duplexes and detached second homes
  • Combining SB9 with an ADU where allowed
  • Tear-down and rebuild scenarios

SB9 Lot Splits & Two-Unit Development Conditions in Reseda

Because the houses started small, additions and second units are the two most common projects. The limits are utility related: main panel size, water service diameter and sewer lateral capacity have to cover the total fixture count. Older stucco and roofing are often at the end of life, which is worth folding into the same permit.

  • Flat rectangular tract lots that simplify ADU siting and parking
  • Small original footprints that favor additions over reconfiguration
  • Panel, water service and sewer lateral sizing for added units
  • 1950s framing usually unbolted to the foundation
  • Roofing and stucco often due at the same time as the remodel

Eligibility Comes First

A lot has to be in a single-family zone, meet minimum size after the split, and sit outside certain hazard and historic categories. Recent rental or eviction history can also disqualify a property. We check all of it before you spend money on design.

  • Zoning and parcel size verification
  • Fire-severity, flood and hazard zone screening
  • Historic district and HPOZ constraints
  • Rental and eviction history review
  • Owner-occupancy and deed restriction requirements

From Parcel Map to Keys

SB9 projects involve a survey, a parcel map, utility separation, and then a full building permit for each unit. Because we design and build, one team carries it from the eligibility letter through the final inspection.

  • Survey and tentative parcel map
  • Separate utility services and meters
  • Architectural plans and structural engineering
  • Plan check corrections handled by us
  • Construction with our own crews

FREQUENTLY ASKED QUESTIONS

Do you do sb9 lot splits & two-unit development in Reseda?

Yes. Reseda is part of our regular service area. We'll come out for a free on-site consultation, walk the property, and tell you what's realistic before you spend anything on design.

What does sb9 lot splits cost in Reseda?

Varies by parcel, unit count and site work. Site conditions in Reseda and your material selections move the number, which is why we price after walking the property rather than over the phone.

Who issues the permit in Reseda?

Permits for this work go through LADBS. We handle the submittal, plan check corrections and inspections as part of the project.

Does my lot qualify for an SB9 split?

It has to be in a single-family zone, be large enough that both resulting parcels meet the minimum, and avoid certain hazard, historic and rental-history disqualifiers. We run the eligibility review before any design work.

How long does an SB9 project take?

Plan on 12 to 24 months from eligibility review to finished units, with the parcel map and plan check often taking as long as construction.

Can I build an ADU on an SB9 lot?

Sometimes, depending on the path you take and your city's implementation. We map out the maximum unit count for your parcel up front so you can compare options.

Do you handle SB9 projects near me outside the City of Los Angeles?

Yes. SB9 is state law, so it applies across California, but every city implements it differently. We handle SB9 lot splits and two-unit developments throughout the greater LA area within about 100 miles of our Woodland Hills office.

Similar Projects We've Built

Free Consultation

DISCUSS YOUR PROJECT WITH 1 SMART BUILD

Licensed, bonded and insured design-build general contractor serving Los Angeles County and Southern California. Tell us about your property and goals, and we'll walk you through feasibility, permitting and a clear plan.

1 (866) 419-8840
Want to price your Los Angeles remodel or addition first?Get an Instant Estimate →

We use session recording and analytics to understand how visitors use this site and improve your experience. By continuing to browse, you consent to this. Read our privacy policy